CC 2010 β€ , Eos 2006 β€ , Golf 2004 β€ , Golf 2009 β€ , Passat 2006 β€ , ...
4-cyl. injection engine (1.8 and 2.0 l engine, chain drive) - Edition 08.2018
Cover with 8 bolts
β Apply silicone sealant to clean sealing surface -arrow 1- and
to edges -arrows 2- of new cover as shown in illustration.
β¦ Thickness of sealant bead: 2 to 3 mm.
Note
β¦ The cover must be installed within 5 minutes after applying the
silicone sealant.
β¦ The bead of sealant must not be thicker than specified, otherβ
wise excess sealant can enter the sump and obstruct the
strainer in the oil intake pipe.
β Install cover immediately and tighten bolts:
β¦ Cover, version with 15 bolts β page 90
β¦ Cover, version with 8 bolts β page 90
β Install vibration damper β page 51 .
Further assembly is basically a reverse of the dismantling seβ
quence.
Note
After fitting cover, let sealant dry for approx. 30 minutes. Only then
fill with engine oil.
β Replenish engine oil and check oil level.
1.7
Camshaft timing chain - exploded view
112
Rep. gr.15 - Cylinder head, valve gear
CC 2010 β€ , Eos 2006 β€ , Golf 2004 β€ , Golf 2009 β€ , Passat 2006 β€ , ...
4-cyl. injection engine (1.8 and 2.0 l engine, chain drive) - Edition 08.2018
1 - Bolt
β 9 Nm
2 - Chain tensioner
β Is spring-loaded
β Depending on version,
secure with locking pin -
T40011- or locking tool -
T40267- .
3 - Tensioning rail for timing
chain
4 - Guide pin
β 20 Nm
5 - Bolt
β 9 Nm
6 - Timing valve
β Left-hand thread
β Checking β page 114
β Remove with assembly
tool - T10352-
β Engine codes CCZA,
CCZB, CCZC, CCZD,
CDAA, CDAB: use asβ
sembly tool - T10352/1-
to remove
β 35 Nm
7 - Bolt
β Renew
β M6: 8 Nm + 90Β° further
β M8: 20 Nm + 90Β° further
8 - Washer
9 - Bearing saddle
10 - Guide rail for camshaft timing chain
11 - Camshaft case
12 - Camshaft timing chain
β Before removing, mark running direction with paint
β Removing and installing β page 114
13 - Guide rail for camshaft timing chain
14 - Guide pin
β 20 Nm
15 - Sprocket
β Crankshaft
β Fitting position β page 114
1. Chain drive
113
CC 2010 β€ , Eos 2006 β€ , Golf 2004 β€ , Golf 2009 β€ , Passat 2006 β€ , ...
4-cyl. injection engine (1.8 and 2.0 l engine, chain drive) - Edition 08.2018
Checking control valve
β It must be possible to press in piston -1- approx. 3 mm against
spring force. It must move freely, without sticking.
Crankshaft chain sprocket - installation position
β’
The two sections -arrows- must be aligned.
1.8
Removing and installing camshaft timing chain
114
Rep. gr.15 - Cylinder head, valve gear